Public Buildings, Hospital

22-3 涪陵中心医院效果图-3.jpg


Fulin Central Hospital Project

Assembly rate: 60.94%

Use function: outpatient building + inpatient building + medical technology building

construction area: 65,000 square meters

This project is the first demonstration project of prefabricated hospital built by the company. The technical system adopted is the Technical system of prefabricated concrete frame structure (partial shear wall)". The PC scope includes: high-precision aluminum molds, ALC slats, and floor slabs (prefabricated pre-stressed laminated slab/prefabricated concrete truss floor slab), prefabricated stairs, external envelope wall, stone with built-in decorative surface and prefabricated thermal insulationexternal wall, etc.