banner
PC Components and Parts Management System


The production process of prefabricated components and parts has the characteristics of complex procedures, large number of products, many types of finished products, many process information, and high requirements for staff collaboration. This determines that the quality management of PC requires not only a large and complete data information system as a backing, but also the information if the database should also dynamically meet the inquiries and application requirements of different users as the production process progresses.


图片32.png


Hengsheng Daye prefabricated component management system makes full use of two-dimensional code scanning technology to break through all production links and realize real-time collaboration and efficient data transmission in the whole production process. Get through the data link of the whole process of component design, process optimization setting, component planning and scheduling, component production, component quality inspection, yard management, component transportation and component site hoisting and establish an efficient collaborative working mechanism.



图片33.png



The system realizes the factory informationization and intelligent management in the Internet era. It is a set of scientific and intelligent component production management information system which is developed by taking full advantage of BIM technology system as the theoretical guidance, using data warehouse, virtual simulation, 3D visualization, GIS, big data and other technologies, combined with different production capacity, personnel quality and production automation degree of component factories in various regions. The visualization of production management kanban, two-dimensional code data collection of production process management, yard information, transportation monitoring and other important information means and applications are realized. At the same time, combined with EPC+ project management subsystem, the design, production and construction of real-time coordination, sharing data and information, to ensure the overall project construction organization and management efficiency.


图片34.png