Zhongke Building Project
Assembly rate: 82.68%
Use function: commercial+office+apartment
Construction area: 38,500 square meters
The project is located on Taibai Road in New District of Fuling. It is the first major demonstration building project in China that adopts the "Steel Tube Confined Concrete Outer Frame-Core Tube Structure System and Externally Mounted Fair-faced Concrete PC Wall Panel Envelope". The building adopts ten new technologies. The two systems of BIM and 3D scanning and inspection are adopted to support the life cycle management of the project. The PC products include: prefabricated toilets, prefabricated stairs, prefabricated laminated panels, prefabricated exterior walls and so on. Safety and quality are ensured through the "BIM simulation construction + three-dimensional disclosure" method before on-site installation. The project saves 5% of cost and 1/3 of the construction period compared with traditional construction methods safety and quality are ensured.
Awards
Green Building Three Stars
Technology Demonstration Project of Prefabricated Building of MOHURD in 2018
National Prefabricated Buildings Industry Base in 2020
The Typical Demonstration Project of Prefabricated Building EPC Project in Chongqing
Quality Structural Engineering Award of Three Gorges Cup
The Second Prize of the 2nd "Huachun Cup" National BIM Technology Application Competition
The First Prize of Chongqing's First BIM Technology Application Achievement in Construction Engineering
The Special Demonstration Project of Green Buildings and
National Key R&D Program of the 13th Five-Year Plan Green Buildings and Key Special Demonstration Projects of Building Industrialization
The First Prize of Chongqing Science and Technology Progress in 2018